Industrial Projects


400 Wolf

400 Wolf Road, Northlake, Illinois

Demolition and reconfiguration of 400 Wolf in Northlake, Illinois

  • Facility, originally built in the 1950s, was modified to accommodate Dr Pepper Snapple Group as a single-user tenant of the building
  • Reconfiguration enabled construction of a 400,000 sq. ft. building pad to the south in anticipation of future building plans
  • Phasing, planning, coordination and communication allowed Dr Pepper Snapple Group to remain fully operational in production and distribution throughout construction
  • Demolishing over ½ million square feet of the existing building After demo, the building spans a little over ¾ of a million square feet
  • Dr. Pepper Snapple Group is now the only occupant of the building
  • 12,620 SF Main Office build out with 1 men’s and 1 women’s bathroom / shower, fitness center, 13 individual offices & storage area.
  • 5,935 SF DSD (sales) Office build out with 1 men’s and 1 women’s bathroom, 5 individual offices, 2 open office areas, 1 conference room, 1 cash room, 1 storage area and 1 break room
  • The original building only had 14 truck dock positions. Phase I included the construction of 37 truck dock positions
  • 37 new truck dock positions
  • Precast concrete wall panels to rebuild exterior façade